BACK

Filling the pond

Final

Final

Final

Final

Final

May 5th

May 5th

May 5th

May 5th

May 5th

May 5th

April 27th

April 27th

April 27th

April 27th

April 27th

The 5th Avenue

This water feature was a remodel of an existing concrete pond. The original had two ponds. We removed both concrete ponds and made one lined pond and a dry creek bed out of the other.

 

BACK